• Contact Lifting

    With over 40 years experience in contract lifting, we can provide you with all you need to get your job done. Take the worry out of making detailed hire and insurance arrangements yourself!

    Contract lifting works on the basis of hiring the crane fully contacted. Unlike CPA hire which you just hire the crane.

    Find Out More ...

  • CPA Hire

    With over 40 years experience in hiring cranes, we can provide you with all you need to get your job done.

    With over 30-40 cranes at our disposal we can make sure we can provide all the equipment to help you.

    Find Out More ...

Contract Lifting

Contract Lifting

Take the worry out of making detailed hire and insurance arrangements yourself!

find out more...

CPA Hire

CPA Hire

With over 30-40 cranes to hire. We can make sure we can provide what you need

find out more...

Site Surveys

Site Surveys

Not sure what service or crane you require? Our
on-site survey can help

find out more...

Members of the CPA

Risk Assessments

As part of the planning process a Risk Assessment must be carried out to identify any hazards. The Risk Assessment should:

  • Evaluate the risks
  • Identify any measures required to eliminate or reduce these risks
  • Be unique to the site
  • Be in writing and used for preparation of the Method Statement

Method Statements

Once the Risk Assessment has been completed a full Method Statement should be prepared detailing the safe system of work for the operation. This should include:

  • The task to be achieved
  • Configuration of the crane at the end of the task
  • Steps to eliminate danger to personnel not involved in the lift
  • Clear statements of responsibilities and roles for each member of the team
  • Any site induction requirements

To find out more, call us on 01580 890112 or email us here

How can we help?

Contract Lifting

Contract lifting works on the basis of hiring the crane fully contacted. Unlike CPA hire which you just hire the crane. It is important to understand the difference between the two as the obligations on the hirer differ.

find out more...

CPA Hire

Crane hire only lifting works on the basis or hiring just the crane. Unlike Contact lifting where you hire the crane fully contacted. It is important to understand the difference between the two as the obligations on the hirer differ.

find out more...

Site Surveys

If your are unsure about any of your lifting requirements, whether we can access your location/site or if your are unsure of what type and size crane your require , then our site surveys may help you.

find out more...

General Crane Hire

Savage Cranes have the flexibility to meet all your lifting requirements. Along with our experience team which is trained to the highest standards in safety.

find out more...

Method & Risk Assessment

As part of the planning process a Risk Assessment must be carried out to identify any hazards. Method Statement should be prepared detailing the safe system of work for the operation.

find out more...

Lifting Plans

Every lift conducted requires a lifting plan to meet with stringent guidelines. Savage Cranes are able to offer plans along with a contract lift.